ABOUT US
PROJECT
EFFECT CHART
NEWS
FEEDBACK
CONTACT US
Golden Fish High L
Cheng Feng 17F ind
Confirmation of the bridal chamber
Read:928    Date:2008-10-22 11:22:49
After getting the house, a lot of people do not know how to confirm, some people think too that stand and already confirm in quality testing, the owner confirms and suspected of uncalled-foring again. In fact, under many circumstances, whether you confirm, you must leave the house. Just discovering the problems before signing, you will be more convenient to investigate the developer's responsibility.
As the unprofessional person, how to confirm the house? Certainly, inside listed special project, all work in confirming any type of house, including confirming the commercial office.

1. See the wall.

Wonder when to begin, seeing the wall unexpectedly becomes primary problem confirmed in houses. In fact even that a house built in the eighties of the 20th century is not as in delicate health as present house. I have seen the most serious house, the window finds in the rainy day that there is phenomenon of infiltrating, ask, just know the wall under all windows of the whole building infiltrates. While meeting and appearing on the stage the wind, make people on tenterhooks especially, and what furthermore made people surprised is, this is built by Land and Resources Bureau of a district, very terrible. So confirm this piece, hand in floor in house, have, pass the second day in heavy rain inspect. At this time if the wall is problematic, almost can't be stealthy.
The wall is besides infiltrating, another question, is whether the wall is the crackle. There are cracks with a door shape of family that a friend has reflected him, questioned to developers later, know it is companion ladder that leave construct, that freight mouth originally, seal mend, later just, deal with and leave future trouble carelessly.

2. Test the water and electricity.

Test water and electricity of house put through at first. Certainly, to fit up advancedly as to some, most water and electricity should be changed on later stage, so sometimes these contents are poured it is not a key, but if you do not plan to change the water and electricity, then these things must be confirmed conscientiously.
Test the electric wire, besides seeing and energizing, mainly see whether the electric wire accords with national standard quality. Whether besides the sectional area of the electric wire fulfils requirements. Generally speaking, the electric wires of the family should not be lower than square 2.5, the air conditioner thread should be up to square 4, otherwise while using the air conditioner, it is apt to soften overheatedly. Certainly, this is a kind of ideal disposition, most electric wires of building construction will be lack of a grade.

3. It is waterproof to test.

What has been said here is waterproof, mean kitchen guarding was waterproof. Certainly, the house handed over at present, some has already declared not to do waterproofly in advance, this needs to fit up and doing. If it is waterproof to already do while handing over, then we have to verify to doing waterproofly well. Try before not fitting up, find, leak or something else when you put and improve relationships then, it is great to safeguard the project. You have, remove, fit up one new ground come, do one new waterproof layer already. The waterproof method of confirmation is: Make a threshold and stop up the gate defended in lavatory with the cement sand thick liquid, then take a glue bag and cover blowdown / water mouth, it is real to tie, then defend and turn on the water in the lavatory, so simple as to do (nearly high 2cm) . Then make an appointment the owner downstairs look over variola defended in its lavatory after 24 hours. The position is that the main one leaks: Direct seepage of the floor; The contact places of channel and floor.

4. Test the channel

Channel here point, mean, drain off water / dirty channel. Still it is a blowdown mouth of balcony,etc., while confirming, take an utensil used for water in advance, then pour water and enter the outlet. See whether water flows and goes smoothly. Why confirm this, because in construction, some workers often know when clean " Steal " This worker. The pipe flow leaves to pour some cement dreg into draining off water, if the cement relatively glue, will stop up on the elbow, it is difficult to cause and drain off water.
Another kind of situations, but has not closed with confirming. That is to see blowdown is in charge of there is conservation storage that defends the discredited elbowing. But the speech according to experience, if blowdown is in charge of not having conservation storage to defend the discredited elbow, the spirit that the quality of so whole house must give a mark 12. Why blowdown in charge of, need the elbow, because elbow can hold water, from channel of lower floor stink smell can block under this layer like this. There is no of the elbow, the outlets of laundry and toilet will distribute a kind of peculiar smell. Perhaps associations of dealers of development just think and use defending the discredited floor drain, practice of the project will be proved, prevent the discredited floor drain from being far from meeting the actual demands. And just because the small such place, often best embody the builder's construction quality.

5. Put down testing

In fact confirm this, have certain difficulty as to general users. Person who test flat measurement most far from gate indoor ground and horizontal error of the ground in the gate. Test this, can reflect the developer's building quality too frequently. Because as owner's side, it is impossible to go to confirm agent structure. Can only see quality from these details then. The measurement method if you do not dislike the trouble, then the method is very simple. Go to the hard ware store to buy a small transparent water pipe, the length is about 20 meters, then fill water with. A sign is drawn from 0.5 meters of overhead at the gate first or place of a meter. Then transfer the water level of the water pipe to the height of this sign, find someone to fix in this seat. Then move another end of the water pipe from the room of the farthest of gate. Then look at the height in this place of water pipe, then do another sign. It then not use ruler in measurement the sign from highly what. Two difference in height these house abstandard. You can analogize so through this kind of method too, measure abstandard degree of the whole room. Generally speaking, if the difference is normal on left and right sides of 2 centimetres, 3 centimetres are in category that can be accepted. If go beyond the scope, you must notice. I meet serious abstandard degree reach 7 most, I think I measurement by mistake still measure. The above-mentioned work are a little convoluted, if you have a friend and have laser to put down the appearance, this problem is so all right as to solve more.

6. It is high to test layer

If your contract has this clause. Then you are one storey of high ones measuring the building. Method very simple, pairs of ruler arrange among them two wall of overcast horns measure (whether this most convenient to put long ruler without becoming curved best methodding) ,You should measure many indoor places. Generally speaking, it is ranges accepted on left and right sides of 2.65 meters, if the house is lower than 2.6 meters, then the house must be considered. This kind of house will make you have to live in a kind of environment constrained in the future. It is high to developer to make short storey, it is a very effective cost-effective method.

1)Reduce the total bearing, the cost of the so basic part can save a part.

2)Though only minus about 10 centimeters, be regarded as overallly, it is a lot that the cost is being saved, still it, to the residential area developed in flakes.

3)In certain height, more layer is counted to reduce one layer of high all right construction.

7. Test the doors and windows

Still it relies mainly on confirming the window here. Key that confirm to confirm window and person who seal of balcony door a bit. Sealing and storing one of the most troublesome points of confirmation of the window is, can try being fine or not only in the big rainy day. But can generally verify by looking over whether the sealed adhesive tape is intact firm this. The balcony door will be generally seen the internal and external abstandard degree on doors of balcony. Having ever seen a kind of situation, the level of the balcony and indoor level are the same, in this way, it is very difficult to avoid oozing the question entered in the big rainy day rainwater.

8. Other special projects

In fact, except special project described above, other confirmation, do if there is more professional knowledging. You might as well bring a friend who knows the project well to confirm the house, this is the only possible thing too. In addition, it is serious that you can only depend on some of quality testing.

[Favourites][Print][Close][back] [Size:16 14 12]  
:Pay attention to clicking in equipment
Next:No longer.
 
 
Copyright © 2008 GOLD RIVER( International ) Engineering All Rights Reserved.  
Address: MACAU CENTRO COMERCIAL FIRST NACIONAL P11-04
Tel:+852-31807689 +853-28701013